Hi Giladzzz
Thanks. Can I connect the new Brocade switch to the exsisting fabric before taking the IBM B24 out of the fabric?
This would mean I have 3 switches in Fabric A and 3 switches in Fabric B. Or do I need to take IBM B24 switch out of Fabric A first, and just have 1 HBA path up on IBM B24 in fabric B until the new Brocade 6510 is connected to fabric A?
Also do I need ISL licsnse? or any other licsnse?
Many thanks