Hello Members,
I would like to know the process for upgrading cascaded san switches.
We have two fabric each with two members. Switches are connected with ISL links & have trunk licenses.
I need to know the below.
1. Do i need to upgrade the subordinate switch first or the principal switch or it does not matter (anything first)
2. What is the correct process to take backup of licenses when we have trunk licenses enabled
2. Backup process for the san switch.
Regards
Patwi